Beginning Monday, the underside of the Crosstown Bridge will be inspected. The operation is expected to be completed by next Friday. At various times, several streets will be flagged to route vehicles around the inspection equipment. They include Johnson, Bridge, South Mechanic, South Center, and Park Streets, including Queen City Drive. Those streets are not expected to be closed at any point during this annual inspection. Residents are advised to avoid the area as much as possible during this time to allow the work to be completed safely and successfully. Pedestrian walking paths will be maintained.